content is empty!
Views: 0 Author: Site Editor Publish Time: 2022-08-31 Origin: Site
Project address: California, USA
Project completion time: October 2017
Project Introduction: The truss part of the stadium lighting and sound equipment adopts Shinestage catwalk ceiling installation. The overall design of the catwalk is based on subverting the traditional truss construction, from a series of troublesome processes such as storage, transportation, on-site installation, storage, etc., to solve the pain points of the current low efficiency of truss construction.
Solve the problems: 1, The design conforms to the effect to heighten the atmosphere of opening ceremony; 2. After the performance, the track truss can be removed quickly, to solve the problem efficiently and quickly.